First Soyuz Almost Ready For Launch From French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 10.12.17

Airborne 10.16.17

Airborne 10.17.17

Airborne 10.11.17

Airborne 10.12.17

Airborne 10.13.17

Airborne-Unmanned 10.10.17

Airborne-YouTube

AMA 10.12.17

Airborne 10.16.17

Airborne 10.17.17

Airborne 10.11.17

Airborne 10.12.17

Airborne 10.13.17

Airborne-Unmanned 10.10.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Fri, May 06, 2011

First Soyuz Almost Ready For Launch From French Guiana

Dry Runs Underway To Test Facilities

The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle.

Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

The rehearsal is simulating the five-day final phase before launch. The final countdown will be performed, including the gantry's rollback to its parked position, about 250 feet from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption.

The countdown resumed Thursday with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (10.15.17): Nonapproach Control Tower

Nonapproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Airborne-Unmanned 10.10.17: Boeing Buying Aurora, DJI Privacy Mode, UAS Delivery

Also: UAS Firefighting, Self-Driving Cars, Karma Drone Follows, Futuristic Unmanned Aircraft, 50-mile UTM Corridor Boeing has announced that it will acquire Aurora Flight Sciences >[...]

ANN FAQ: You Can Sponsor ANN And/Or Aero-TV!

Help ANN Grow So That We Can Be Of Greater Service To You! For the better part of a dozen years, ANN has set the pace for the growing and evolving aero-info revolution. No other ne>[...]

ANN's Daily Aero-Linx (10.16.17)

Aero Linx: The Combat Helicopter Pilots Association (CHPA) The Combat Helicopter Pilots Association (CHPA) was incorporated as a Non-Profit, 501 (c) 19 veterans organization in Was>[...]

AMA Drone Report 10.12.17: NTSB--Drone v Blackhawk, City Drops Reg, DJI Privacy

Also: PassengerDrone, FAA Reauthorization Extension, UAS Pilot Certification, Workhorse Surefly The NTSB is now offering public details of the alleged collision between a hobby dro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC