Boeing Says Dreamliner Production Has Resumed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jan 31, 2009

Boeing Says Dreamliner Production Has Resumed

Asserts First 787 Will Fly In Second Quarter

Boeing says production of its 787 Dreamliner resumed Thursday, for the first time since last year's  machinists strike, with the join of the fifth airplane designated for flight test. Aircraft ZA005 is the first to be powered with General Electric GEnx engines.

The major assemblies were loaded in final body join over the past several days. The fuselage and wing joins occur simultaneously.

"This airplane signifies our return to a steady production rhythm," said Jack Jones, vice president of 787 Final Assembly and Change Incorporation. "Sections are arriving in Everett at the completion levels committed by our partners and close to what is expected for mature production. The substantial progress made by our partners streamlines the assembly process, which is essential as we ramp up production."

Five of the six airplanes designated for flight test are now in varying stages of production. Power was restored earlier this week to the first flight-test airplane, ZA001, and production testing has resumed as the airplane prepares for first flight in the second quarter.

Rolls-Royce engines are hung on ZA002, in the fourth and final production position in the factory. The third and fourth flight-test airplanes, ZA003 and ZA004, are in the third and second production positions, respectively.

Fastener rework is done on ZA001, nearly complete on ZA002 and progressing well on the third and fourth airplanes, Jones said. As ANN reported earlier this week, Boeing has opted to leave out-of-spec fasteners in hard-to-reach, non-crticial places, in order to meet the planemaker's latest timeframe for the troubled program.

"We have applied the resources necessary to complete all the outstanding work on these airplanes and keep the production line moving forward," Jones stressed.

Assemblies for the final flight-test airplane, ZA006, are in production at partner sites worldwide. In all, assemblies for 30 Dreamliners are in production at this time.

The Dreamliner has orders for 895 airplanes from 58 airlines. That figure was once over 900 aircraft... but this week, Russian airline S7 announced it has cancelled its order for 15 planes, due to uncertainty about the global economy. The airline now plans to lease those planes from a third party.

FMI: www.boeing.com/commercial/787family/

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC