NASA Says Redesigned Shuttle Tank Won't Fly Until '08 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 02, 2006

NASA Says Redesigned Shuttle Tank Won't Fly Until '08

Current Modifications Proving Sturdy

Saying the current design of the space shuttle's external fuel tank "has proven to be more robust" than first thought, managers at NASA have decided to put off redesigning the problematic component until 2008.

NASA already revised several components of the external tank in the wake of the February 2003 loss of the shuttle Columbia. That accident was caused by insulating foam that broke off the tank, and damaged the shuttle's ceramic-tile heat shield.

More changes have been made to each tank that has flown on shuttle launches since July 2005, building on the lessons learned from the mission before it -- most notably, the removal of an aerodynamic load ramp that was the source of significant foam breakage. Engineers also refined the process of applying to the tank, to prevent the situation that doomed Columbia.

It seems to have worked. NASA says that in each of the three shuttle flights that followed Columbia, foam breakage has been lessened greatly -- and any pieces that have broken off did so late enough in the launch to not pose a significant threat.

Engineers have been working on a more thorough redesign of the tank, however, incorporating changes to the attachment points that mate the tank with the orbiter.

NASA spokesman Kyle Herring said the new tank will use titanium mounting brackets, for example, instead of the current aluminum units. Titanium handles extremes in temperature far better than the current steel assemblies... and thus will require less foam to be applied. The new tank was originally to go online sometime in 2007.

"It just gives you some added confidence and less risk," Herring said of the new design.

But the current tank has proven to be surprisingly sturdy... so NASA plans to have the redesign ready in early 2008, in time for a planned shuttle mission to the Hubble Space Telescope. That mission will require the shuttle to travel to a higher orbit than the current roster of missions to the International Space Station... and, thus, will need more fuel.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC