VEM Receives Airbus Certification For A310 Rudder Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 30, 2008

VEM Receives Airbus Certification For A310 Rudder Repairs

Assemblies Susceptible To Delamination

VEM Maintenance & Engineering has been chosen by Airbus as its only Authorized Repair Center in Latin America to overhaul the composite rudder assemblies of the Airbus A310 fleet.

The Brazilian company notes it already holds all major certifications in both airplane and component maintenance.

Airbus says VEM's technical capacity was the determining factor for the company to be chosen and certified. Another positive point was VEM's "White Room" (a chamber with environmental control: temperature, relative humidity, and suspended particles), which can hold the rudder of the A310, and meets all of Airbus' control standards.

The course was held from October 20-31 at Airbus' facilities in Stade, Germany. VEM sent a team of three members (technicians/engineers), from the Composite Structures Area, to take the training and then to multiply it within the company.

The course focused on theoretical and practical aspects of the construction and repair concept of the A310 rudder, including key parts of the process, such as delamination and disbonds caused by the moisture entrapment... defects that reduce the structural integrity of these components (shown above).

"Besides the importance of this certification for VEM's portfolio of services, it was also important for the growth of the team," comments Structural Engineer Rodrigo Gaya. "Airbus presented to us the techniques developed over the past five years, so that the same quality assured by Airbus is assured by its Authorized Repair Centers. It was gratifying to hear commented by Airbus' technical team and by Project Manager Olaf Rokitta that VEM obtained the best results in the entire history of this training, which took place on the ninth day of testing."

FMI: www.vem.aero/, www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC