Shuttle Foam Problems Increased With Switch To Environmentally Friendly Foam | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 02, 2005

Shuttle Foam Problems Increased With Switch To Environmentally Friendly Foam

Discovery Thermal Protection System Damage Appears Minimal

NASA switched to a Freon-free insulating foam for the external fuel tanks starting with the STS-87 flight of the Shuttle Columbia in 1997. This flight received dramatically more damage then previous flights. Subsequent shuttle flights using the new foam continued to result in up to 11 times more damage then previous flights with the original foam.

The switch to the environmentally friendly foam was made as part of a NASA effort to reduce the environmental impact of space flights. EPA regulations banning CFC's including Freon were put in place due to a suspected link to high altitude Ozone layer depletion.

Examination of the extensive inspection photographs of Discovery has found only small damage to the thermal protection system. NASA has admitted that it was simply luck that one piece of foam almost as large as the one blamed for the destruction of Columbia missed the leading edge of Discoveries wing, and has grounded the remainder of the shuttle fleet until a solution is found. If that piece of foam would have fallen off just 30 seconds sooner in the flight it may have hit the shuttle with similar force as the one that doomed Columbia.

A detailed search through the pictures and video taken during Discovery's launch has found a much smaller piece of foam that apparently deflecting off the wing. Other items found during the inspection include a piece of damaged tile on the critical nose wheel door and a piece of gap filler, which insulates between the tiles, which is protruding located slightly farther back on the belly of the shuttle. These areas are being examined in great detail.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC