Arianespace Readies Rocket For Year's Fourth Heavy-Lift Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, May 16, 2011

Arianespace Readies Rocket For Year's Fourth Heavy-Lift Mission

Assembly Underway on Ariane 5 Booster For Upcoming Launch

The Ariane 5 for Arianespace's fourth heavy-lift mission of 2011 has begun its initial build-up at the Spaceport, and joined another launch campaign being conducted in parallel.

Assembly of this latest Ariane 5 follows the same procedures as employed for the 58 launchers that preceded it, with activity beginning in the Launcher Integration Building.  The core cryogenic stage was raised into position over one of two mobile launch tables in service at the spaceport, and was followed by the positioning of two solid propellant boosters for mating with the core stage. 

Arianespace's upcoming flight ... designated VA203, for the 203rd mission with an Ariane family launcher ... will mark another of Ariane 5's dual-payload missions, carrying two TV broadcast and telecommunications relay satellites. BSAT-3c/JCSAT-110R is a co-procured spacecraft by Japan's Broadcasting Satellite System Corporation (B-SAT) and SKY Perfect JSAT Corporation, with its launch to be performed by Arianespace in the scope of a turnkey launch contract with American manufacturer Lockheed Martin. ASTRA 1N will be operated by Luxemburg-based SES, which has a multi-launch agreement with Arianespace that also includes the orbiting of its SES 2 satellite in 2011.

The Ariane 5 mission with BSAT-3c/JCSAT-110R and ASTRA 1N will follow Arianespace's upcoming VA202 heavy-lift launch, which is to loft the ST-2 and GSAT-8 satellites on May 19.  This launcher currently is in the spaceport's Final Assembly Building, where payload integration is now underway.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC