Tanking Test Confirms Repair Success | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 02, 2009

Tanking Test Confirms Repair Success

Endeavour Clears Hurdle For July 11 Launch

A test fueling of space shuttle Endeavour's external tank revealed no gaseous hydrogen leaks, verifying recent repairs were successful, NASA managers confirmed during a Wednesday afternoon news conference at NASA's Kennedy Space Center in Florida.

The tanking test began at 0652 EDT Wednesday. During the next three hours, teams in the Launch Control Center watched closely for signs of a leak as liquid oxygen and liquid hydrogen poured into the massive orange tank. Previous attempts to launch Endeavour on the STS-127 mission were scrubbed by a leak in the area of the Ground Umbilical Carrier Plate, which attaches a gaseous hydrogen vent line to the external tank. Crews worked to investigate and repair the problem.

"There were absolutely no leak indications whatsoever noted on the two leak detectors," said Launch Director Pete Nickolenko. "We'll continue to look at the data, and our next step is to move toward launch."

Endeavour's launch is targeted for July 11 at 1939 EDT.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC