Breaking News: Ares 1-X Test Launch Scrubbed Due To Weather | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Oct 27, 2009

Breaking News: Ares 1-X Test Launch Scrubbed Due To Weather

Will Attempt Wednesday Launch

ANN Realtime Update: 10.27.2009 1200 EDT:  The Ares I-X launch team is preparing for a 24-hour turnaround, targeting 0800 on Wednesday as liftoff time for the Ares I-X flight test vehicle.

Tuesday's attempt was plagued by weather issues, even though the vehicle itself was ready to fly. After multiple attempts to reset to new launch times during the 4-hour window, the final scrub came when the weather did not improve as the end of the window neared. Wednesday's weather improves somewhat, with a 40 percent "no-go."

Wednesday's attempt will have the same 4-hour window that ends at noon.

Original Story: As hard as they tried, the weather would not cooperate with the Ares I-X launch team. They have called a scrub for today and will make a determination regarding an attempt for tomorrow.

The countdown held at T-4 minutes for over two hours, delayed first by a cargo ship in the launch box, and later by increasing winds. When the ship was first  seen in the launch range, a launch controller said "I don't want to see this delayed until weather becomes a problem."

But weather became a problem. While clouds and a few showers moved in over the launch complex, it was eventually sustained winds of about 20 knots which eventually caused NASA to call a scrub.

Launch Test Director Jeff Spaulding instructed the launch team to begin safing the vehicle and set up for a recycle of the countdown.

"We had some opportunities, but just couldn't get there," Spaulding said to the team. "Weather didn't cooperate."

The Ares 1-X team will make a determination later today about trying again to launch on Wednesday.

FMI: www.nasa.gov

 


Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC