Mars Reconnaissance Orbiter Gets Busy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 18, 2005

Mars Reconnaissance Orbiter Gets Busy

NASA's Mars Reconnaissance Orbiter, launched on Aug. 12, has completed one of the first tasks of its seven-month cruise to Mars, a calibration activity for the spacecraft's Mars Color Imager instrument.

"We have transitioned from launch mode to cruise mode, and the spacecraft continues to perform extremely well," said Dan Johnston, Mars Reconnaissance Orbiter deputy mission manager at NASA's Jet Propulsion Laboratory, Pasadena, Calif.

The first and largest of four trajectory correction maneuvers scheduled before the orbiter reaches Mars is planned for Aug. 27.

For the calibration task on Aug. 15, the spacecraft slewed about 15 degrees to scan the camera across the positions of the Earth and Moon, then returned to the attitude it will hold for most of the cruise. 

Data were properly recorded onboard, downlinked to Earth and received by the Mars Color Imager team at Malin Space Science Systems, San Diego.  Dr. Michael Malin of Malin Space Science Systems, principal investigator for Mars Color Imager, said the image data are being processed and analyzed.

This multiple-waveband camera is the widest-angle instrument of four cameras on the orbiter, designed for imaging all of Mars daily from an altitude of about 300 kilometers (186 miles). Imaged at a range of more than 1 million kilometers (620,000 miles) away, the crescent Earth and Moon fill only a few pixels and are not resolved in the image. However, this is enough useful information to characterize the instrument's response in its seven color bands, including two ultraviolet channels that will be used to trace ozone in the Mars atmosphere. 

This is the first of two events early in the cruise phase that check instrument calibrations after launching. The second will occur in early September when higher resolution cameras are pointed at Earth and the Moon as the spacecraft continues its flight to Mars.

The Mars Reconnaissance Orbiter will reach Mars and enter orbit on about March 10, 2006. After gradually adjusting the shape of its orbit for half a year, it will begin its primary science phase in November 2006. The mission will examine Mars in unprecedented detail from low orbit, returning several times more data than all previous Mars missions combined. Scientists will use its instruments to gain a better understanding of the history and current distribution of Mars' water. By inspecting possible landing sites and by providing a high-data-rate relay, it will also support future missions that land on Mars.

FMI: www.nasa.gov/mro

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC