The Flight Is To Mars ... But There's A Lengthy Layover In Florida | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 27, 2011

The Flight Is To Mars ... But There's A Lengthy Layover In Florida

NASA's Next Mars Rover Arrives At KSC From CA. Launch Preparations Begin For Fall Mission

The Mars Science Laboratory rover, also known as Curiosity, arrived late Wednesday night at NASA's Kennedy Space Center aboard an Air Force C-17 transport plane. It was accompanied by the rocket-powered descent stage that will fly the rover during the final moments before landing on Mars. The C-17 flight began at March Air Reserve Base in Riverside, CA, where the boxed hardware had been trucked from NASA's Jet Propulsion Laboratory in Pasadena, CA.


Curiosity Arrives On C-17 Transport

The rover's aeroshell -- the protective covering for the trip to the Red Planet -- and the cruise stage, which will guide it to Mars, arrived at Kennedy last month. The mission is targeted to launch from Cape Canaveral Air Force Station between Nov. 25 and Dec. 18. The car-size rover will land on Mars in August 2012.

"The design and building part of the mission is nearly behind us now," said JPL's David Gruel, who has managed Mars Science Laboratory assembly, test and launch operations since 2007. "We're getting to final checkouts before sending the rover on its way to Mars."


Curiosity Before Shipping

The rover and other spacecraft components will undergo more testing before mission staff stack them and fuel the onboard propulsion systems. Curiosity should be enclosed in its aeroshell for the final time in September and delivered to Kennedy's Launch Complex 41 in early November for integration with a United Launch Alliance Atlas V rocket.

Curiosity is about twice as long and more than five times as heavy as any previous Mars rover. Its 10 science instruments include two for ingesting and analyzing samples of powdered rock delivered by the rover's robotic arm. During a prime mission lasting one Martian year -- nearly two Earth years -- researchers will use the rover's tools to study whether the landing region has had environmental conditions favorable for supporting microbial life and favorable for preserving clues about whether life existed.


Curiosity On Mars Artist's Rendering

JPL built the rover and descent stage and manages the mission for NASA's Science Mission Directorate in Washington. Launch management for the mission is the responsibility of NASA's Launch Services Program at Kennedy. The California Institute of Technology in Pasadena manages JPL for NASA.

FMI: www.nasa.gov/msl

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC