Kinetic Energy Interceptors Team Completes Key Missile Defense Rocket Motor Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Nov 17, 2008

Kinetic Energy Interceptors Team Completes Key Missile Defense Rocket Motor Test

On Schedule For First Flight In 2009

The Raytheon Company and Northrop Grumman Kinetic Energy Interceptors team fired a powerful first-stage rocket motor Friday, keeping the KEI program on schedule for a 2009 booster flight test.

The test demonstrated the operation of the first-stage rocket motor in its complete flight configuration, using the same thrust vector control system and interface hardware that will be used for the 2009 flight test.

KEI is designed to be a globally deployable, mobile missile defense system. It includes a highly maneuverable kill vehicle carried by a quickly accelerating and very maneuverable missile. This integrated weapon system provides a persistent, all-weather capability to destroy intermediate and intercontinental ballistic missiles in their boost to midcourse phases of flight.

"We are on track for next year's scheduled booster flight test," said Chuck Ross, Raytheon Missile Systems' vice president of KEI. "The KEI Team has embraced a test-like-you-fly methodology that provides consistent Mission Assurance for the program."

Northrop Grumman leads the team charged with developing and testing a KEI capability for the Missile Defense Agency. Raytheon heads the program's interceptor development work. Alliant Techsystems is Raytheon's principal subcontractor and is responsible for performing Stage 1 and Stage 2 rocket- motor development work. Orbital Sciences will integrate the booster and prepare range operations for the 2009 flight.

FMI: www.raytheon.com, www.northropgrumman.com, www.atk.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC