New Upgrades Revitalize B-1B Lancers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 06.18.18

Airborne-UnManned 06.19.18

Airborne 06.13.18

AMA Drone Report 06.14.18

Airborne 06.15.18

Airborne-YouTube

Airborne 06.18.18

Airborne-UnManned 06.19.18

Airborne 06.13.18

AMA Drone Report 06.14.18

Airborne 06.15.18

Sun, Jun 10, 2012

New Upgrades Revitalize B-1B Lancers

Official: 'These Upgrades Will Give Us An Entirely New Aircraft'

B-1B Lancers are currently undergoing the most advanced hardware and software upgrades to date as part of the Sustainment-Block 16 program, according to Air Force officials. Sustainment-Block 16 upgrades include a fully integrated data link in the aft station and vertical situation display upgrade in the front station as well as updates to navigation, radar and diagnostic systems.

"The B-1 has never seen this many upgrades in one block," said Maj. Thomas Bryant, the 337th Test and Evaluation Squadron assistant director of operations. "These upgrades will give us an entirely new aircraft; this is a game changer."

The aft crew station will now receive five new color displays, all capable of providing moving maps and data link integration. Weapon systems officers will receive full "QWERTY" keyboards and new controllers to interface with the integrated battle station software. Furthermore, a new MIDS LVT-1 radio, using integrated battle station capabilities, brings the B-1 into the Link-16 network, allowing the B-1 to send and receive text messages, imagery and mission assignments.

Unlike current messaging capabilities, fully integrated data link assignments will interface directly with the aircraft, allowing combat commanders the capability to send target sets directly to weapons onboard the B-1. "The new data link capability is huge for the B-1," Bryant said. "Command and control assets will have the ability to send us targets electronically, automatically linking into our system rather than manually entering the coordinates."

While the fully integrated data link upgrades primarily support the weapon systems officers in the aft station, Sustainment-Block 16 also includes vertical situation display upgrades for the front station. Pilots receive a new digital flight instrument display, providing more precise flight parameters. The pilot and co-pilot stations each receive a new 8-inch by 10-inch multi-function display and the same cursor control that is installed in the aft station. These new situational displays provide independent moving maps and link information to the front station, supplying them identical information available to the aft station.
 
Fully integrated data link and vertical situation display upgrades have now completed developmental testing at Edwards Air Force Base, Calif., and soon three 337th TES aircraft will be modified with the new upgrades. Developmental testing for the entire Sustainment-Block 16 package is scheduled to begin March 2013. Under the current program schedule, the 337th TES will begin operational testing September 2013.

FMI: www.af.mil

Advertisement

More News

Thunderbirds, Snowbirds Head To North Texas

Will Be Performing At The Bell Fort Worth Alliance Air Show Oct. 13-14 The renowned U.S. Air Force Thunderbirds and the Canadian Forces Snowbirds Air Demonstration Squadrons will s>[...]

Chambliss Trains For Red Bull Air Racing Using Hot Air Balloons

Pilot Prepping For Next Races In The Series Air racing is, by any estimation, a specialized skill, and one that required a lot of training. But training for a pylon race like the R>[...]

Aero-News: Quote of the Day (06.18.18)

“It is such an honor to enjoy the continued support of Tuskegee Airmen Charles McGee and George Hardy. For years these gentleman have lent their support to help us create a m>[...]

Klyde Morris (06.18.18)

Klyde... What's All The Fuss About? FMI: www.klydemorris.com>[...]

Airborne 06.15.18: 100LL Replacement Held, B-1 Stand-Down, Missing USAF Officer

Also: Sichuan Airlines Pilot Feted, Emirates Parks 20 Birds, Air Paris Academy Orders Tecnams, Two A380s Scrapped The FAA continues to be committed to evaluating suitable replaceme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC