New Terminal To Open Soon At Hampton Roads Executive Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Apr 29, 2011

New Terminal To Open Soon At Hampton Roads Executive Airport

Construction On A New Runway Will Kick Off Next Week

A new executive terminal will officially be opened at Hampton Roads Executive Airport next week, and construction on a new runway will get underway that same day. The grand opening celebration and ribbon-cutting for the new runway will be held on Friday, May 6 at noon with remarks from Congressman Randy Forbes and Virginia Director of Aviation Randall Burdette.  The event will be a celebration of reaching a long awaited goal to better serve the Hampton Roads community with new, first-class facilities for aviation needs. Festivities will include a BBQ luncheon and Blue Skies Grille menu for all participants, music, raffle of a week at fly-in destination Bimini, Bahamas, and fuel discount coupons for all attending pilots.

After four years of terminal study and design, construction on the new $2,000,000 terminal facility was begun in the spring of 2010.  The contemporary building features vast glass windows in its spacious 20ft high passenger lobby for great air traffic viewing, a planned patio for outdoor seating, 28-person conference room, and state-of-the-art services for pilots and crew. The construction also includes new access and turn-around for automobile traffic. Funding for the terminal was provided by the Department of Aviation of Virginia and the owners of the airport, Virginia Aviation Associates LLC.

Equally important is the construction commencement of the new runway. It took the owners - Steven I. "Steve" Fox and David A. "Andy" Gibbs - ten years to seek final approval from the Corps of Engineers, DEQ, DOAV and the FAA. Funding for the runway is being provided by the FAA, DOAV and the owners of the airport. Inclusive of land acquisition, environmental studies, design, and construction, the project will top $30,000,000 in investment.

Hampton Roads Executive Airport positively impacts the local community through its support of aviation businesses based at the airport - five flight schools, aerial photography, aviation maintenance and avionics, banner tow operations, aircraft brokerage, corporate and business aviation activities, and recreational aviation.

The facility is a public use, privately owned reliever airport, ranked #2 in the State of Virginia among 57 non-towered airports in annual operations (takeoffs and landings) and #3 for economic drivers among all VA general aviation airports.

FMI: www.flypvg.com

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC