Utilicraft Aerospace Industries, M7 Aerospace Sign Agreement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 19, 2007

Utilicraft Aerospace Industries, M7 Aerospace Sign Agreement

Firms Will Work To Develop FF-1080 Freighter Prototype

Utilicraft Aerospace Industries of Albuquerque, NM tells ANN it has contracted with M7 Aerospace LP for the design and development of the pre-production prototype wing and powerplant installation for Utilicraft's fledgling FF-1080 Freight Feeder aircraft. 

The FF-1080-200 is a high-wing, twin-engine turboprop aircraft designed to carry eight fully loaded LD3 cargo containers for a distance of 500 nautical miles. Lighter loads can be carried distances up to 2,000 nautical miles, although the aircraft is primarily intended for use in the short haul feeder role for large volume package carriers.

M7's Engineering Division has begun designing attachments and interface of the Pratt & Whitney PW-127G engines and nacelles to the existing prototype wing center section. Fuselage design and tooling is underway at Utilicraft and Metalcraft Technologies Inc.

Utilicraft currently has orders and options for 25 FF-1080-200s. The aircraft is designed to have short takeoff and landing (STOL) capability, to operate from airfields with less than 3,500 feet of available runway.

"We are pleased to be associated with the development of this exciting new product that brings so much value to the air cargo industry," said Joe Furnish, vice president of M7's Engineering Division. 

M7's Engineering Division provides a wide variety of engineering services to M7 Aerospace, its customers, and other organizations or individuals requiring design, analysis or test procedures.

M7's engineering team has certified aircraft and systems to requirements of the US Federal Aviation Administration, the European Aviation Safety Agency (EASA), and other foreign certification agencies, spanning the requirements of FAR 23, 25, 27, 29 and their European equivalents.  The team is familiar with both fixed- and rotary-wing aircraft.

Utilicraft plans to have the FF-1080 certified to FAA Part 25 requirements.

FMI: www.m7aerospace.com, www.utilicraft.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC