NASA Delays Plan To Visit Asteroids | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jan 24, 2006

NASA Delays Plan To Visit Asteroids

Cost Overruns Keep Dawn On The Ground

NASA's Dawn spacecraft, which was to be launched this summer on a mission to explore two of the solar system's largest asteroids, will remain on the ground while the agency struggles with cost overruns and technical issues with the program.

Mission planners had actually been ordered to halt work on the probe last fall, according to the Associated Press, pending an independent review of the program. Those findings should be presented to NASA January 27.

Even if the project is given the green light, however, it would take at least another year to run final tests and prepare the spacecraft for launch, according to the University of California's Christopher Russell, who is principal investigator on the mission.

"It's like running a relay race," Russell said. "You're on your last leg and the judges suddenly say 'Stop.' You lose your momentum."

Dawn is part of NASA's Discovery program, which was originally conceived to explore the solar system on a relatively inexpensive budget. The successful Stardust mission, which just ended last week, is also part of Discovery.

Unlike Stardust, the Dawn program (which advertises "The Asteroid Belt at Your Fingertips" on its NASA website) has suffered several setbacks -- including ruptured fuel tanks that forced engineers to make due with lower levels of xenon gas to fuel the probe's anticipated nine-year journey to Ceres and Vesta. Both asteroids are in the main asteroid belt between Jupiter and Mars.

Originally, the program's cost was capped at $371 million, according to Russell. When project scientists went looking for another $40 million, NASA ordered the stand down to find out why.

FMI: http://dawn.jpl.nasa.gov/

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC