Boeing Begins Assembly Of First Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 22, 2007

Boeing Begins Assembly Of First Dreamliner

Imagine A REALLY Big Model Kit...

Final assembly of the first Boeing 787 Dreamliner began Monday, with a ceremony in Everett, WA.

"Today we begin assembling the first airplane of a new generation," said Scott Strode, 787 vice president of Airplane Definition and Production. "The 787 not only will revolutionize air travel, it represents a new way of building airplanes."

With 568 firm orders from 44 airlines, the 787 is the fastest-selling new airplane in aviation history. The 787 production system was designed using Lean manufacturing techniques in a simplified final assembly process.

"The 787 production system is the culmination of the lessons we've learned building previous airplanes," said Steve Westby, 787 vice president of Manufacturing and Quality. "Using composites on the 787 airframe has a number of manufacturing advantages. We are able to build huge structure in just one piece, which means we essentially have six major end items coming together in final assembly -- the forward, center and aft fuselage sections, the wings, the horizontal stabilizer and the vertical fin."

Boeing states since the 787 is assembled from these large assemblies rather than many smaller pieces, traditional monument assembly tools are not necessary. Portable tools, designed with ergonomics in mind, move the assemblies into place. No overhead cranes are used to move airplane structure.

"A composite airframe also means less waste in production and fewer hazardous materials used during the assembly process," Westby said. "This is good news for the environment and for our team of manufacturing technicians building the airplane."

Although the first airplane will take about seven weeks to assemble, the 787 team looks to continuously improve flow time as production ramps up. Ultimately, Boeing intends to have a 787 roll out of the Everett factory every three days.

The first 787 will roll out of the factory on July 8, 2007.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC