STS-126 Flies With New Software To Enhance Safety | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Nov 17, 2008

STS-126 Flies With New Software To Enhance Safety

Updated Displays Vital In Case Of Launch Abort

As Endeavour lifted off last Friday on the 124th Space Shuttle flight, a new software upgrade aimed at improving mission safety was also on board.

The upgrade, provided by United Space Alliance, improves crew situational awareness, long-term system maintainability and robustness, and enhances vehicle performance in the unlikely event of an abort.

The updates, collectively known as Operational Increment 33 software, or OI-33, have been made to the Primary Avionics Software System (PASS) that flies the Space Shuttle, the Backup Flight System (BFS) software that could take over from PASS if needed, and the display software used in the Multifunction Electronic Display Subsystem (MEDS) computers.

The astronauts have two new displays that give them real-time data to help select the safest landing site in the unlikely event the Shuttle cannot reach orbit or in the event of an emergency reentry.

"This marks a significant safety improvement for the Space Shuttle, and shows how we continue to invest our experience and expertise in the system," said Loren Shriver, United Space Alliance's Chief Technology Officer.

The Ascent Bearing Display, designed for use during launch, includes multiple maps that change as the Orbiter position moves. Shuttle General Purpose Computers compute constantly updated estimates of the distance that the orbiter can glide. This information is presented to the flight crew through the Bearing Display maps, which include location markers for the available Shuttle nominal and abort landing sites within that estimated distance.

The Entry Bearing Display, designed for use during an abort landing, shows a plot of the estimated distance, or range, to three crew-selected landing sites. The Display includes the range and any maneuvers required to reach a landing site as well as an estimation of whether the orbiter has enough energy to reach the three displayed landing sites.

The upgrade also enhances software governing the External Tank separation during the unlikely event of a Return to Launch site (RTLS) abort landing. This improvement will enable a faster increase in the distance between the Orbiter and the ET immediately following separation, reducing the chance of contact to near zero.

FMI: www.unitedspacealliance.com, www.nasa.gov/shuttle

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC