Former 787 Chief Says Boeing May Reconsider Global Supply Network | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Nov 01, 2007

Former 787 Chief Says Boeing May Reconsider Global Supply Network

Good News For Washington... Or Not

We screwed up? Well... former Boeing 787 chief Mike Bair wasn't quite as blunt as that, when he told Snohomish County, WA business leaders and politicians this week the planemaker may reconsider its much-touted global supply strategy, now causing headaches in the Dreamliner program... but one could argue that was the underlying implication.

Bair (right) -- ousted as 787 program manager two weeks ago, in the aftermath of the announcement of a six-month delay following months of assurances the aircraft's first flight and first delivery remained on schedule -- kept a prearranged appointment to speak Wednesday before the Snohomish County Economic Development Council (EDC), reports the Seattle Times.

Now in a much-less visible role at Boeing, Bair held the attention of the audience... particularly when he spoke of a possible shift in Boeing's current philosophy of outsourcing engineering and production of key aircraft components to companies around the world.

Traditionally, Boeing performed the design and engineering work for its airliners, and then contracted the build work out to vendors, who would use Boeing blueprints -- a system known as "build-to-print." The planemaker tried a new tact with the 787 -- it allowed vendors to handle the engineering work, too.

That business model hasn't paid great dividends for the 787, as supplier trouble is the most commonly-cited reason for the Dreamliner delay.

"Some of these guys we won't use again," Bair said bluntly, referencing problem suppliers. "Some of them proved incapable of doing it." In an interview with the Times following his speech, Bair was even more candid -- expressing wonderment how some suppliers seemed "unwilling, for whatever reason" to do the job they promised.

"They just didn't do what we thought they could do," Bair said. "Who knows why?"

For the planemaker's next major project -- believed to be the so-called Y3, a replacement for the erstwhile 737 narrowbody -- Bair said Boeing may opt for a new plan.

"The right way to do this would be to have all those big parts across the street so you could just roll them in" to a single manufacturing site, Bair said. "We'll see on the next airplane programs whether we can accomplish something like that."

County leaders loved hearing that. The greater Seattle area hosts three Boeing aircraft production plants, so the natural assumption was Washington state would host such a "super-site," too.

Well, you know what they say about "assume"-ing something. In a later interview, Bair said the plant could be located in Washington, "or someplace else. It doesn't necessarily have to be here."

Boeing executives have a history of speaking boldly before the EDC. It was here in 2003 -- as the state fought to win the production site for the 787 -- then-Commercial Airplanes CEO Alan Mulally summed up Washington's economic competitiveness with two little words: "We suck."

The state legislature responded then, passing massive tax incentives for Boeing to locate Dreamliner production in Everett. Bair's comments set the stage for another showdown.

EDC President Deborah Knutson told the Times she already knew Snohomish County didn't have a lock on winning Boeing's next major commercial airliner. "I cannot imagine that the 737 replacement will automatically come here," Knutson said. "From everything I've heard, we'll need to work for it."

As for the 787, Boeing will have to work for it, too... to get the plane out the door, and into the hands of several hundred eager customers. Bair -- now head of business strategy and marketing for Boeing Commercial Airplanes -- outlined the difficulties with the knowledge of an insider, blessed with 20/20 hindsight.

Bair admitted problems with supplier parts for the first aircraft overwhelmed the production system in Everett. The plant was called on to pinch-hit on several areas -- either correcting defects with supplier assemblies, or handling the engineering and design work outright -- with somewhat predictable results.

"That whole production system is built for 1,200 pieces," Bair said. "Everything about it was designed for 1,200 parts. We threw 30,000 at it."

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC