Two F-35 Fighters Arrive Together At Edwards AFB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, May 19, 2010

Two F-35 Fighters Arrive Together At Edwards AFB

Non-Stop Flight From Texas To California Signals Test Flight Expansion

Two F-35A Lightning II stealth fighters flew nonstop from their final-assembly site in Fort Worth, TX, to Edwards Air Force Base, CA, Monday, signaling a further expansion of F-35 flight test operations. The arrival is the first in a series that will increase the Edwards F-35 test fleet to at least eight aircraft.


File Photo

U.S. Air Force Test Pilot Lt. Col. Hank "Hog" Griffiths and Lockheed Martin Chief Test Pilot Jon Beesley flew the jets, known as AF-1 and AF-2, nonstop in the first multi-ship, long-range F-35 flight.

"The ferry flight went very smoothly, and reflects how the Air Force and Lockheed Martin will work cooperatively as we enter long-term F-35 testing at Edwards," Beesley said. During the jets' deployment to Edwards, the F-35s will undergo ground- and flight-test activities for propulsion, aerial refueling, logistical support, weapons integration and flight-envelope expansion.

"Through rigorous flight testing we are developing dominant and lethal 5th generation fighter capability for America and her allies," said Doug Pearson, Lockheed Martin vice president of F-35 test and verification. "This historic moment at Edwards Air Force Base begins the planned expansion of F-35 flight test to a third permanent operating location. Lockheed Martin F-35A flight testing is a highly integrated partnership with the United States Air Force." Three F-35s are currently undergoing flight trials at Naval Air Station Patuxent River, MD, the primary test site for the F-35B short takeoff/ vertical landing variant and the F-35C carrier variant. F-35s have conducted more than 200 test flights, with six additional test aircraft scheduled to begin flying and deploying to the two test sites this year.


File Photo

The F-35A conventional takeoff and landing (CTOL) variant - designed to meet U.S. Air Force requirements - is also the primary export version of the Lightning II. The air forces of Italy, the Netherlands, Turkey, Canada, Australia, Denmark and Norway will employ the F-35A.

FMI: www.lockheedmartin.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC