FAA To Look At Tucson Tower | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 08, 2009

FAA To Look At Tucson Tower

Upgrade Or Replace Are The Two Options

The FAA is taking a look at the control tower at Tucson International Airport to see if the 1950's era facility should be replaced, or if an upgrade would address controller's concerns.

The FAA visited the airport in October to assess the tower, and to discuss potential new tower sites with airport officials. The Arizona Daily Star reports that Jill Merrick, Tucson Airport Authority vice president of planning and development, will pay a visit to the FAA Airport Facilities Terminal Integration Laboratory in Atlantic City, N.J., next month for further study of potential new tower sites.

That siting study is the first step in making a decision about whether to build a new tower, or to upgrade the present facility, according to FAA Western-Pacific Region spokesman Ian Gregor. The study will center on three potential sites identified in 2005 by airport officials. That is expected to be completed next summer.

Controllers have long complained about the tower. They say at 112 feet it is too short, its windows are too small, and subject to "blinding glare." No accidents or controller errors have been attributed to the condition of the tower, Gregor said last week. "The tower is old, but it is adequate and safe," he said

But new or upgraded, it could be several years before the project is funded by the FAA, which will pay the entire cost. After the initial site study, an environmental assessment must be completed, and then money must be appropriated for the project, and with so many variables, no cost estimate has yet been determined.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC