SpaceX Completes Qualification Of Falcon 9 First Stage Tank And Interstage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jul 31, 2009

SpaceX Completes Qualification Of Falcon 9 First Stage Tank And Interstage

Milestone Passed in both MEOP And Structural Bending Tests

Space Exploration Technologies (SpaceX) says they have successfully completed qualification testing for the Falcon 9 launch vehicle first stage tank and interstage. Testing took place at SpaceX’s Texas Test Site, a 300 acre structural and propulsion testing facility, located just outside of Waco, Texas. The milestone was announced Thursday

The first stage tank and interstage hardware were subjected to a proof test of 1.1 times the maximum expected operating pressure (MEOP), and a burst pressure proof test of 1.4 MEOP; qualifying both articles with a 1.4 factor of safety. The 1.4 factor of safety designation means that the first stage tank and the interstage can withstand 140 percent the maximum internal pressure expected during flight, and qualifies both pieces of hardware to meet human rating safety requirements, as defined by NASA. The first stage also passed this human rating milestone when subjected to structural bending tests.

The testing regimen included over 150 pressurization cycles, exceeding the number of required life cycles by more than 100. In addition, the first stage and interstage were subjected to stiffness tests, maximum dynamic pressure loading and main engine cutoff conditions; all at expected values, as well as ultimate loads.

Falcon 9

“Falcon 9 continues to pass qualification testing in preparation for its first flight, scheduled for 2009,” said Elon Musk, CEO and CTO of SpaceX. “All hardware was designed to be man-rated, and these tests confirm that SpaceX is one step closer to flying humans on the Falcon 9/Dragon system.”

Falcon 9’s first stage and interstage also passed ground wind qualification tests, critical for when the vehicle is vertical on the launch pad at Cape Canaveral Air Force Station in Florida. Both components were designed, built and tested by SpaceX.

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC