Assembly Of 1,000th 777 Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 01.16.17

Airborne 01.17.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Airborne Hi-Def On YouTube

Airborne 01.16.17

Airborne 01.17.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Fri, Nov 11, 2011

Assembly Of 1,000th 777 Underway

Program Reaches Milestone Faster Than Any Other Twin-Aisle Airplane

Workers began assembling the 1,000th 777 on Wednesday. The airplane, a Boeing 777-300ER, will be delivered to Dubai-based Emirates Airline in March 2012.

Production began with loading of the 97-foot wing spar – the main support structure for the wing – into a giant tool that automatically drills, measures and installs more than 5,000 fasteners into the spar. The spar components are built in Auburn, WA.

"We reached this milestone in only 16 years, eight years sooner than the runner up the 747, because of the enormous popularity of the airplane by the airlines that operate it, and the passengers who fly on it," said Larry Loftis, vice president and general manager of the 777 program. "Sixty-four airlines have ordered 1,295 777s. The numbers prove that the 777 is the world's preferred airplane. In fact, it's preferred 1,000 times over." 

A ceremony to mark the start of production was held today in Everett. Additional employee thank-you events will be held as the airplane moves through the 49-day build process. "We couldn't have reached this milestone without the innovation and inspiration of the thousands of employees here at Boeing and at the more than 500 suppliers around the globe that build the 777," Loftis said. "We thank them and honor them for their contribution to aviation history," he said.

Emirates is the largest 777 customer with 95 777s currently in its fleet; the 1,000th 777 will be its 102nd.

FMI: www.boeing.com

Advertisement

More News

Airborne 01.19.17: $200K Drone Fine, Sandia IVSI TSO, 'Can't Close' KSMO

Also: MH370 Search Suspended, Supporting AUVSI, Sikorsky S-92, Challenger Astronaut, Stressed Pilots, JBA Aviation, Embraer E2 A settlement agreement has been reached between the F>[...]

Washington Special Flight Rules Modified For Trump Inauguration

Increased Flight Restrictions Will Be In Place Over Washington D.C. The planned 2017 Presidential Inauguration Festivities in Washington, DC are scheduled for January 20, 2017. At >[...]

Airborne 01.18.17: AirVenture 2017, King Schools Drone Test, Tico Warbirds

Also: Plastic Fuel, 747 Down, Great Lakes, Lily Suit, Neffenger Stepping Down, Coast Flt Training, Boeing-SpiceJet EAA-AirVenture is many things to many people, and not the least o>[...]

Airborne 01.19.17: $200K Drone Fine, Sandia IVSI TSO, 'Can't Close' KSMO

Also: MH370 Search Suspended, Supporting AUVSI, Sikorsky S-92, Challenger Astronaut, Stressed Pilots, JBA Aviation, Embraer E2 A settlement agreement has been reached between the F>[...]

U.S. Forest Service Releases 'Learning Review' From Helicopter Accident

Two Fatally Injured When The Aircraft Setting Controlled Burns Went Down In Mississippi A 90-page "Learning Review" has been released by the U.S. Forest Service analyzing an accide>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC