Boeing Celebrates Groundbreaking For 777X Composite Wing Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 24, 2014

Boeing Celebrates Groundbreaking For 777X Composite Wing Center

Investment Of More Than $1 Billion Will Sustain Thousands Of Jobs In The Puget Sound Region

Boeing this week celebrated the groundbreaking of its new 777X Composite Wing Center at the Everett, WA campus.  Permitting for the new 1-million-square-foot facility was completed approximately seven weeks earlier than anticipated, allowing for an accelerated start to construction.

Boeing is investing more than $1 billion in the Everett site for construction and outfitting of the new building.

Once completed, the facility located on the north side of the main final assembly building will help usher in composite wing fabrication for the company's newest commercial jetliner and sustain thousands of local jobs for decades to come.

"We're excited with the progress being made on this new facility that will play a crucial role in bringing the 777X to market," said Boeing Commercial Airplanes President and CEO Ray Conner. "We wouldn't be in this position without the support of our teammates and partners throughout the Puget Sound region and in Olympia – we owe them all a debt of gratitude."

Completion of the new building, which is expected in May 2016, will require approximately 3.5 million hours of work. At its peak, there will be approximately 1,200 contract employees working on the project. By the numbers, the new building will require:

  • 31,000 tons of steel
  • 480 miles of electrical cable
  • 80,000 linear feet of process piping
  • 530,000 cubic yards of fill material
  • 170,000 tons of concrete

To date, the 777X has accumulated 300 orders and commitments. Two models will comprise the 777X family – the 777-8X, with approximately 350 seats and a range capability of more than 9,300 nautical miles; and the 777-9X, with approximately 400 seats and a range of more than 8,200 nautical miles. The 777-8X competes directly with the Airbus A350-1000, while the 777-9X is in a class by itself, serving a market segment that no other airplane can. First delivery of the 777X is targeted for 2020.

(Images provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC