Embraer Ready To Begin Assembly Of First Phenom 100 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Mar 31, 2007

Embraer Ready To Begin Assembly Of First Phenom 100

VLJ's Design, Production Planning Simulated Digitally

The newest very-light-jet has started to take shape in Brazil. Embraer reports that the first Phenom 100 fuselage and wing have been completed at the Company's Botucatu plant, in outstate Sao Paulo. The aircraft is now at the Sao Jose dos Campos facility for wing-fuselage mating, and final assembly.

As Aero-News reported earlier this week, the two PW617 Pratt & Whitney Canada engines have also been received by Embraer. The light turbofans are due to be installed in April.

"We are thrilled to announce yet another key milestone in the Phenom 100 program," said Luis Carlos Affonso, Embraer Executive Vice-President, Executive Jets. "The advanced technology applied to the Phenom 100 product design and manufacturing has enabled a smooth assembly of the fuselage and wings, and we have already begun the production of the second aircraft."

Embraer notes the design and production planning of the Phenom jets are entirely digital. The manufacturing of all primary parts was simulated via a digital manufacturing, and virtual numeric-control software.

After simulation, the main structures of the first Phenom 100 were built with an automated riveting machine.

With the advance of the final assembly of the first jet, the main fuselage sections and structures of the second Phenom 100 aircraft have begun the initial assembly process.

FMI: www.embraer.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC