NASA Reschedules Test of Max Launch Abort System For June 25 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 22, 2009

NASA Reschedules Test of Max Launch Abort System For June 25

Numerous Delays Plague Test Program

Because of delays completing preliminary tests at the launch site, NASA has rescheduled the test launch of the Max Launch Abort System, or MLAS, to no earlier than June 25 at the agency's Wallops Flight Facility on Wallops Island, Va. The launch window will extend from approximately 5:45 a.m. to 10 a.m. EDT.

The unpiloted test is part of an effort to design a system for safely propelling future spacecraft and crews away from hazards on the launch pad or during the climb to orbit. This system was developed as an alternative concept to the launch abort system chosen for NASA's Orion crew capsule.

MLAS was named after Maxime (Max) Faget, a Mercury-era pioneer. Faget was the designer of the Project Mercury Capsule and holder of the patent for the “Aerial Capsule Emergency Separation Device,” which is commonly known as the escape tower.

While the Orion launch abort system has a single solid launch abort motor in a tower positioned above the Orion Crew Module, the MLAS concept for an operational vehicle would have four or more solid rocket motors attached inside a bullet-shaped composite fairing. Both are designed to propel the crew module and associated fairing from the Ares I Rocket in event of a launch emergency.

The MLAS demonstration vehicle consists of a full-scaled composite fairing, a full-scaled crew module simulator and four solid rocket abort motors mounted in the boost skirt with motor mass simulators in the forward fairing. The pad abort test doesn’t actually begin until the seven second mark at burnout of the solid motors. Test points of interest are demonstration of unpowered flight along a stable trajectory, MLAS vehicle reorientation and stabilization, followed by crew module simulator separation from the MLAS fairing, stabilization and parachute recovery of the crew module simulator.

Because the MLAS flight test vehicle was not optimized for weight and parachute performance, there may be recontact between the elements of the test vehicle after the parachutes are fully deployed and after all the required data is collected. If recontact does occur it will not affect the MLAS test objectives, nor will it apply to Orion -- as the MLAS design and hardware are not representative of the current Orion design.

The MLAS flight test vehicle weighs over 45,000 lbs. The 33-foot-high MLAS vehicle will be launched to an altitude of approximately one mile to simulate an emergency on the launch pad. A full-scale mockup of the crew capsule will separate from the launch vehicle and parachute into the Atlantic Ocean.

FMI: www.nasa.gov/centers/wallops/missions/mlas.html, www.nasa.gov/constellation

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC