Emergency AD: Sikorsky | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 30, 2009

Emergency AD: Sikorsky

AD NUMBER: 2009-23-51

MANUFACTURER: Sikorsky Model S-92A helicopters
SUBJECT: Airworthiness Directive 2009-23-51

SUMMARY: This Emergency Airworthiness Directive (AD) is prompted by reports of cracks in the main gearbox (MGB) mounting foot pads and foot ribs. The manufacturer is investigating the root cause of these cracks. Contributing factors may include corrosion and the bushing press fit in the mounting foot bolt hole. This condition, if not detected, could result in loss of the MGB and subsequent loss of control of the helicopter.

We have reviewed Sikorsky Alert Service Bulletin No. 92-63-020, dated September 11, 2009 (ASB), which describes procedures for visually inspecting the MGB assembly mounting foot pads and foot ribs for a crack and corrosion. The ASB specifies a 10-hour recurring visual inspection. If you suspect a crack, the ASB specifies a fluorescent penetrant inspection (FPI) or a dye penetrant inspection (DPI). If you find a crack, the ASB specifies replacing the MGB before further flight. Also, the ASB specifies treating any corrosion.

This unsafe condition is likely to exist or develop on other helicopters of the same type design. Therefore, this AD requires within 10 hours time-in-service (TIS), unless accomplished previously, and thereafter at intervals not to exceed 10 hours TIS, cleaning and inspecting each MGB assembly mounting foot pad and rib for a crack and corrosion. If no crack is found, the AD also requires applying a corrosion preventive compound. If you find a crack, the AD also requires replacing the MGB before further flight. If you find corrosion, bubbled paint, or paint discoloration, this AD also requires you to repair the MGB before further flight. The actions specified in this AD are interim actions.

This rule is issued under 49 U.S.C. Section 44701 pursuant to the authority delegated to me by the Administrator, and is effective immediately upon receipt of this emergency AD.
 

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/54BF5C46CA5907D48625765E0060C640?OpenDocument

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC