Tinker AFB Airmen Complete First Repairs On F117 Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 10, 2011

Tinker AFB Airmen Complete First Repairs On F117 Engine

Maintenance Function Transferred To Tinker In 2010

Airmen from the 76th Propulsion Maintenance Group and Pratt & Whitney mechanics recently completed repairs on the first F117 engine of the newly-obtained workload at Tinker AFB. The Pratt & Whitney manufactured engine powers the C-17 Globemaster III.

"The significance is that this engine was the first ever produced in partnership with an original equipment manufacturer, Pratt & Whitney," said Col. Robert Helgeson, the 76th PMXG commander. "Additionally, production of this engine qualifies and certifies (Tinker Air Force Base's F117 Heavy Maintenance Center) is capable to produce quality and conforming engines for the C-17 fleet."

The Heavy Maintenance Center at Tinker AFB opened in June 2010, after three years of planning. The work consists mostly of on-condition maintenance, meaning when field personnel determine an engine isn't operating as efficiently as possible or there is something physically wrong with it, the engine is sent in for repair, officials said. Through the partnership, the Oklahoma City Air Logistics Center provides floor space, equipment and touch labor while Connecticut-based Pratt & Whitney supplies repair instructions, engineering support, supply chain management and repair supplies, officials said.

Once the workload matures, engines are expected to arrive at the facility every two to three days, and technicians will fix each engine in an estimated 60 days, officials said. Due to the learning curve, the first engine took several months to finish, but officials said they expect the gap to close as technicians become more experienced. When engines leave Tinker, they are routed to Charleston AFB, S.C., for testing. If they pass, they are installed onto aircraft. If engines fail the testing, they are returned to Tinker for further repair. Through the next five to six months, testing capabilities are expected to be relocated to the Oklahoma base, said Leonard Hayes, the 76th PMXG engine business office depot activation manager.

Measuring 13-feet wide and 24-feet long, and weighing approximately 10,000 pounds, the F117 is the largest engine repaired at the Oklahoma City Air Logistics Center, he said. A single engine produces approximately 41,000 pounds of thrust, which is nearly twice the thrust produced by an E-3 Sentry's TF33 engine. Four F117 engines power each C-17, enabling it to reach speeds of 450 mph. There are more than 1,000 F117 engines in the fleet, and base officials are expected to handle about one-third of the workload, Mr. Hayes said. "These engines are being used all the time," Mr. Hayes said. "Anytime anything goes across the ocean, it almost always flies on one of these aircraft. These aircraft are also used for in-theater transport."

Currently there are 30 mechanics in the shop able to work on four engines, but that too is expected to change, he said. Later this year, after the 45,000 square-foot shop is expanded to 96,000 square feet, the facility is expected to be able to accommodate six to ten engines at a time, with up to 150 technicians assigned to the workload.

Officials at the C-17 Program Office at Warner-Robins Air Logistics Center, GA, will invest approximately $43.6 million in the facility and equipment, he said. Within the next two years, management for the engine will be transferred to Oklahoma City, but the airframe will still be supported at Warner-Robins Air Logistics Center.

"This sets up the ALC with a long-term workload," Hayes said. "As other engines are beginning to decline, there will still be a steady work requirement, and we'll be better set up for its way forward."

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC