NASA Selects Orion Vibration Test Capability Contractor | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Aug 22, 2007

NASA Selects Orion Vibration Test Capability Contractor

Will Measure Vibration Qualities Of Capsule

NASA has selected Benham Constructors LLC of Oklahoma City to receive a contract to design, build and commission a vibration and acoustic test capability that will support development of the Orion crew exploration vehicle. Orion will carry astronauts to the International Space Station and back to the moon in the next decade.

The capability will be developed in the Space Power Facility at Plum Brook Station in Sandusky, OH, which is operated by NASA's Glenn Research Center in Cleveland. This procurement specifically addresses the vibration and acoustic capability that will supplement the test capabilities currently existing at the Space Power Facility.

The contract is valued at $51.4 million.

Benham Constructors LLC will provide all labor and materials to construct the vibration and acoustic test capability, which will include a mechanical vibration facility, a reverberant acoustic test facility and a high-speed data acquisition system. NASA selected Benham Constructors LLC for the cost-plus-incentive fee contract on a competitive basis.

The design, build and commission portion of the contract has an 18-month period of performance with an additional six-month period of technical support. The environmental tests will demonstrate the ability of Orion hardware to meet specified performance requirements in simulated conditions, such as those experienced during launch, in orbit and during re-entry.

Thermal, acoustic, mechanical vibration and electromagnetic compatibility tests will be conducted during Orion qualification. The launch abort system, crew module, service module and spacecraft adapter will be tested.

The Space Power Facility contains the world's largest thermal vacuum chamber, which measures 100 feet in diameter by 122 feet high. The facility can simulate in-space conditions, such as low vacuum environments and temperature extremes. The new test capability at the Space Power Facility also will support future NASA Constellation Program testing.

The Constellation Program is developing spacecraft and other systems to support NASA's exploration missions to the moon, Mars and other destinations in the solar system.

FMI: www.nasa.gov/constellation

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC