Cornerstone Laid For New Bombardier Facility In China | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 26, 2010

Cornerstone Laid For New Bombardier Facility In China

Construction Of Factory That Will Manufacture CSeries Aircraft Fuselage Underway

Construction of the facility that will build the fuselage for the all-new Bombardier CSeries mainline commercial jetliner has begun. The event - another step in Bombardier's progress toward a 2013 entry-into-service for the CSeries aircraft - was marked with a foundation stone-laying ceremony today at the site in Shenyang, China.

The 226,042 sq. ft. facility will be operated by Shenyang Aircraft Corporation (SAC), a subsidiary of the state-owned aviation industrial entity, China Aviation Industry Corporation (AVIC). SAC is a key supplier in the Bombardier CSeries aircraft program.

Pierre Beaudoin, President and Chief Executive Officer, Bombardier Inc. took part in the ceremony at the Shenyang National Aviation and High Technology Industrial Base in Dongling District.

"Bombardier believes in the China aviation industry and is encouraged to see the further development of the Shenyang National Aviation and High Technology Industrial Base as a center of design and manufacturing excellence," Beaudoin said.

SAC delivered the first test article in the CSeries aircraft program - a fuselage test barrel - to Bombardier's Saint-Laurent, Quebec site on August 19, 2009. The test barrel is being used to demonstrate manufacturing and engineering structural concepts before the CSeries aircraft's final design phase begins later this year. It has already been subjected to 40,000 simulated flight cycles of testing.

The Shenyang facility joins two other new CSeries aircraft installations that are already under construction. In September 2009, Bombardier celebrated the groundbreaking of the first CSeries aircraft building in Quebec, Canada. Located in Mirabel, 45 minutes north of Montreal, the Complete Integrated Aircraft Systems Test Area (CIASTA) will test aircraft systems for reliability and functionality one year before the first prototype aircraft flies. In November 2009, construction got under way on the company's new state-of-the-art aircraft wing manufacturing and assembly facility in Belfast, Northern Ireland.

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC