NASA Sets New Shuttle Target Launch Dates | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 23, 2008

NASA Sets New Shuttle Target Launch Dates

Hubble Mission Will Lift Off October 8; Atlantis To Continue Flying

On Thursday, NASA officially adjusted the target launch dates for two space shuttle missions in 2008. Atlantis' STS-125 mission to the Hubble Space Telescope is now targeted for October 8, and Endeavour's STS-126 supply mission to the International Space Station has moved from October 16 to November 10.

As ANN reported earlier this month, the final servicing mission to Hubble was moved from August 28 due to a delay in deliveries of components, including the external fuel tanks, and the need to prepare Endeavour for a possible rescue mission approximately two weeks after STS-125 launches. Under the previous schedule, the fuel tank for that rescue mission -- designated STS-400 -- would not have been available in time.

Flights beyond STS-126 will be assessed and coordinated with NASA's international partners at a later date. Both shuttle and station program officials will continue to consider options for the remainder of the shuttle flights, with those target launch dates being subject to change.

Earlier plans had called for Atlantis to be retired following the Hubble mission, as the vehicle is due to undergo a major overhaul following STS-125 -- only to be retired along with the rest of the fleet in September 2010. Atlantis was to serve as a parts mule if needed for the two remaining shuttles in the fleet.

However, the Shuttle Program has since determined Atlantis will be assigned two additional flights after the Hubble mission, in order to more efficiently fly the remaining shuttle flights using the three orbiters in sequence. This new plan might also be due to optimism on NASA's part, that a bill now in the House of Representatives to add three missions to the shuttle schedule -- and remove the 2010 retirement deadline -- will be approved by lawmakers.

The third orbiter, Discovery, is scheduled to lift off May 31 on a construction mission to the ISS.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC