Boeing Completes Canadian CF-18 Hornet Modernization Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 29, 2010

Boeing Completes Canadian CF-18 Hornet Modernization Project

Upgrades To Multiple Systems Over A 9 Year Span

Boeing delivered the 79th and final upgraded CF-18 Hornet aircraft to the Canadian Department of National Defence during a ceremony in Mirabel, Quebec on Thursday, hosted by industry partner L-3 Communications MAS, who performed final upgrade installations. The delivery brings the nine-year, two-phased CF-18 Modernization Project to a close.

File Photo

Phase 1 of the project, completed in 2006, upgraded the Canadian Hornet fleet’s avionics, radar, radio and weapons capabilities. Phase 2 provided the following improvements:

  • A data link system to ensure Canadian forces are interoperable with aircraft from the United States and other allied nations.
  • The Boeing Joint Helmet Mounted Cueing System to improve weapons targeting.
  • New color cockpit displays to increase situational awareness.
  • An upgraded, chaff-and-flare dispensing electronic warfare system to improve survivability.

Phase 1 was valued at $436 million and Phase 2 at $150 million. Boeing designed the upgrades and completed two prototype aircraft. L-3 Electronic Systems, with locations in Halifax, Nova Scotia, and Toronto, developed and produced the upgraded crew station displays. L-3 Communications MAS installed the upgrades on the program’s remaining 77 aircraft.

"Boeing’s upgrades to Canada’s CF-18 fleet will ensure that this fighter force will remain effective and operationally credible for many years to come," said Jim O’Neill, vice president and general manager, Boeing Integrated Logistics. "Nearly 30 years after the delivery of the first CF-18 Hornet, Canada’s defense forces are better equipped than ever, with more capability and a fully modernized fleet, due to the innovative upgrades designed and installed by Boeing and our partner, L-3 Communications MAS."

"Across all four regions of Canada, Boeing worked with more than 25 Canadian suppliers and organizations through direct and indirect work packages that were an integral part of Boeing’s Industrial and Regional Benefits program for CF-18 modernization," said Pete Peterson, country director and vice president in Canada for Boeing Defense, Space & Security. "All technical program milestones were completed on schedule and within budget, and we completed industrial and regional benefits commitments early, making this a truly successful program."

FMI: www.boeing.com, www.forces.gc.ca

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC