EVB Noise Study Results Irk Abatement Committee Members | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Apr 19, 2009

EVB Noise Study Results Irk Abatement Committee Members

Findings Said Not To Be Representative Of An Average Day's Air Traffic

Typical of numerous Florida airports built during WWII as training bases, residential areas have built up around the New Smyrna Beach, FL Municipal Airport (EVB) over the years. And equally as typical, residents who now reside near the airport have voiced their objections to noise from airport operations, spurring city officials to study the problem.

Released last week, the preliminary findings of a federally approved airport noise study of EVB conducted by an environmental consulting firm have received a dissatisfied response from the city's mayor and Noise Abatement Committee.

The East Volusia News-Journal reports that the first part of a FAR Part 150 study performed by environmental consulting firm ESA was presented at last Thursday's meeting of the New Smyrna Beach Noise Abatement Committee, but was criticized as being skewed and not representative of an average day's aircraft noise.

Using sound measuring equipment positioned at eight locations in the area, three days of monitoring noise generated by airport traffic led ESA to conclude that the sound levels did not meet "significant noise impact" thresholds.

Mayor Sally Mackay said she wanted to be confident that the $265,000 study accurately measured a "representative day" having an average amount of air traffic. "We want this to be well-done, well-received and believed," Mackay said.

"There is a difference of opinion of what we can expect to come out of this study and what will come out of the study," committee chairman Jim Speer said. "They did not do enough" to measure repetitive noise generated by frequent training flights flying circuits in the traffic pattern, he added.

Local resident William Hausler said, "(If you are monitoring) when planes aren't flying, how can you use that as a sample? That is a waste of time and money."

ESA project manager Ron Seymour, who has managed Part 150 noise study projects in Los Angeles, Seattle, and Portland, pointed out potential shortcomings with such studies: Planned in advance, it's not possible to predict weather conditions and other factors that affect flight patterns.

Seymour said the comments voiced at the meeting were not unusual. "We hear them all the time," he said.

FMI: www.esassoc.com, www.cityofnsb.com/index.asp?NID=235, www.nsbairportnoise.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC