Tunica Airport Improvements Set to Begin | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, May 28, 2009

Tunica Airport Improvements Set to Begin

A New Terminal Could Be Coming Soon

More federal stimulus money is being spent on aviation's "shovel ready" projects. Tunica Municipal Airport hopes to begin long-planned improvements with the help of money from the FAA, the Mississippi DOT, and The American Reinvestment and Recovery Act. As much as $10 million in improvements are on airport officials' wish list.

Among the projects Executive Director Cliff Nash hopes to begin this year are a long-discussed new terminal, a transportation courtyard, and a new fire station. That last project alone could get up to $1.25 million in stimulus money, according to the Memphis Business Journal. A $1.5 million expansion of the airport apron is planned using money from the FAA.

Nash told The Nashville Business Journal the terminal could be built without federal stimulus money because of a $10 millon bond from Tunica County. He said the airport has nearly a million dollars from the Mississippi DOT that it has to spend before June 5th in order to qualify for stimulus dollars, and that money can't be held over for the terminal project.

The airport has seen a 30 percent increase in passenger traffic already this year.

If the county bonds are released this summer, Nash said work on the terminal could begin as early as August. Down the road, he hopes to be able to build a control tower at the airport, which would allow military traffic and accommodate larger corporate jets. He said the airport already has reauthorization to hire a tower staff ...but that they need to build it before they can come.

FMI: www.tunicaairport.com

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC