Boeing Receives Type-Certification For Its Dreamlifter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 05, 2007

Boeing Receives Type-Certification For Its Dreamlifter

Four-Plane Fleet Will Be Used To Ferry 787 Assemblies To WA

Boeing announced Monday its Dreamlifter, the specially modified 747-400 used to transport the major assemblies for the 787 Dreamliner, was granted type certification on Saturday, June 2, from the US Federal Aviation Administration (FAA).

The certification recognizes the Dreamlifter has successfully passed all of the testing and safety requirements required by the FAA. The Dreamlifter does not need to be certified by other regulatory agencies.

"This certification reflects not only the safety and reliability of the Dreamlifter but also its remarkable performance," said Scott Strode, 787 vice president of Airplane Definition and Production.

As part of the flight test program, FAA officials flew on board the Dreamlifter as it delivered major sections of the Dreamliner from partner sites around the world to the Boeing factory in Everett, WA for final assembly. Boeing reports the flights allowed the FAA to validate the overall delivery process and tools.

The Dreamlifter is not certified to carry passengers beyond essential crew. The Dreamlifter completed 437 flight-test hours and 639 hours of ground testing since its first flight on September 9, 2006.

With certification achieved, operation of the Dreamlifter fleet will soon be assumed by Evergreen International Airlines (EIA) of McMinnville, OR. EIA must first complete the required New Airplane Process Document process proving it is ready to operate the aircraft. Boeing expects the transition to EIA to occur in June.

Boeing currently has two Dreamlifters in operation, with a third now under construction. Eventually, four Dreamlifters will be utilized to ferry subcontractor-assembled components of the 787 to Everett.

FMI: www.boeing.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC