Initial Airworthiness Tests Completed For Boeing 747-8 Freighter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 12, 2010

Initial Airworthiness Tests Completed For Boeing 747-8 Freighter

Remaining Two Test Airplanes Can Now Begin Flight Tests

Initial airworthiness testing on the Boeing 747-8 freighter has been completed, enabling test engineers to be on board during future flights and allows the remaining two 747-8 freighter test airplanes to begin flight test.

"The airplane is performing as expected in the initial stages of flight test," said Mo Yahyavi, vice president and general manager of the 747 program, Boeing Commercial Airplanes. "That's a tribute to the men and women who helped design and build this airplane."

Since the first flight in early February, the program has conducted 13 flights, achieving several key accomplishments. Pilots have taken the airplane to an altitude of 30,000 feet (9,144 m) and a speed of Mach .65. The program has completed approximately 33 hours of flying. Initial stall tests and other dynamic maneuvers have been run, as well as an extensive checkout of the airplane's systems. Five different pilots have flown the newest Boeing freighter.

"This is a critical milestone in our test and certification plan," said Andy Hammer, test program manager for the 747-8, Boeing Commercial Airplanes. "With the addition of the other two airplanes in the near future, the test program will ramp up significantly. We will expand the flight envelope and demonstrate the airplane's capabilities."

In the weeks ahead, the 747-8 Freighter will reach an altitude of more than 43,000 feet (13,106 m) and a speed of Mach .97. Subsequent testing will push the airplane beyond expected operational conditions. Flight testing is expected to continue for several months. All told, the 747-8 Freighter test program calls for approximately 3,700 hours of testing using three test airplanes. First delivery is planned for the fourth quarter of this year.

Boeing has secured 108 orders for the 747-8, 76 of which are orders for the new freighter.

FMI: www.boeing.com

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC