USAF Airmen Resume Refurbishing Tankers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Dec 17, 2003

USAF Airmen Resume Refurbishing Tankers

As the saying goes, it's what's on the inside that counts. That is the case for a 45-plus-year-old KC-135 Stratotanker that has recently gone through an interior sprucing-up, by airmen of the 92nd Maintenance Squadron’s equipment excellence shop.

"These improvements are critical to our mission," said Col. Anthony M. Mauer, 92nd Air Refueling Wing commander. "It's no small task, but the folks in maintenance are doing an incredible job keeping this aircraft (ready)."

During the tanker refurbishing process, the airmen not only refurbished the aging aircraft, they also made improvements to their process.

"We've improved the process for cutting floorboards with new equipment and streamlined (it) from a two-person to a one-person process," said Staff Sgt. Josh Shull, equipment excellence technician. "We purchased a new vertical-panel saw (that) allows more accurate cuts, (and saves) us time and money, with no more reworked boards and with less waste."

The 14-person refurbishing team includes crew chiefs, aerospace ground equipment operators, sheet-metal airmen and electronic specialists.

"Basically anyone from (the maintenance group) can work in this shop," Shull said.

It takes the team 15 days to completely refurbish the inside of the aircraft.

The airmen begin the process by disassembling everything from the cockpit to the boom pod. Then, they sand everything that needs to be painted including the floor. Next, they establish their paint plan, which includes masking off areas and taking parts into a booth to be painted. After the floor is painted, they install the freshly painted equipment and complete quality checks.

Masking paper waste was reduced with the creation of reusable templates for the aircraft, Shull said. The templates lowered the cost of hazardous waste that previously had to be disposed. This improvement also effectively helps the environment, he said.

"With the new dual-bulb florescent tube light system on the aircraft, we are able to work more efficiently (because of) better visibility," Shull said.

The improved lighting has helped the team produce a higher quality paint job and saves time because there is less resanding.

"These good ideas have saved us money in terms of man-hours instead of direct monetary impact," Shull said.

"The jets come out… looking and operating like they're (supposed) to,” Mauer said.

The first KC-135 refurbishing project is scheduled for completion this week. [ANN Thanks Tech. Sgt. Martie Capoeman, 92nd Air Refueling Wing PA]

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC