NASA Bulks Up Ares V Moon Rocket | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 27, 2008

NASA Bulks Up Ares V Moon Rocket

Now 20-Feet Taller, Additional Main Engine

Following a nine-month design review of the rocket that will one day return US astronauts to the moon -- and, eventually, transport them to Mars -- on Wednesday NASA unveiled a bulked-up version of its proposed Ares V rocket.

The Associated Press reports the amped-up Ares is 20 feet longer than the previous version, now standing close to 38-stories tall. The rocket's first stage now sports six main engines instead of five, and the twin solid-rocket boosters attached to the stage will also be made larger, to hold more fuel.

All the changes are intended to allow Ares to carry heavier payloads, especially as the space agency looks to the Red Planet. In the new configuration, NASA says the upgraded Ares V will be able to haul over 156,600 pounds of cargo.

"We've looked at over 1,700 different Ares concepts," Ares program manager Steve Cook said. Major work on the Ares V will begin after the current space shuttle fleet is retired in 2010, he added.

Though comparable in size and scope with the mammoth Saturn V rocket that carried astronauts to the moon in the late 1960s and early 1970s (Ares V is now about 15 feet taller), there's one fundamental difference with the Ares V: it will not carry people into orbit, just their supplies and the lunar lander. The four-man crew will ride into orbit in the Orion space capsule atop the smaller Ares I rocket, and will then rendezvous with the departure stage containing equipment launched onboard the larger rocket.

The two-step design allows more equipment to be sent to the moon or Mars.

Constellation program manager Jeff Hanley told reporters Wednesday NASA remains on track for a manned lunar mission by 2020. "This extensive review proves we are ready for the next phase: taking these concepts and moving forward," he said.

FMI: www.nasa.gov/mission_pages/constellation/main/

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC