First P-8A Poseidon Moves From Final Assembly To Preflight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 14, 2008

First P-8A Poseidon Moves From Final Assembly To Preflight

Scheduled To Enter Service With US Navy In 2013

Boeing Integrated Defense Systems (IDS) and Boeing Commercial Airplanes (BCA) employees gathered this week in Renton, WA to celebrate the completion of final assembly on the first P-8A Poseidon for the US Navy and its move to preflight work.

IDS and BCA are building the P-8A, a military derivative of the 737-800, on a third final assembly production line in Renton, home to commercial 737 production.

"We're proud to have completed final assembly on the first P-8A Poseidon," said Mo Yahyavi, vice president and P-8 program manager for BCA. "Our objective on the P-8 program is to provide the Navy with the world's most advanced maritime patrol and reconnaissance aircraft. BCA and IDS working together as one team will be able to do just that."

IDS will now focus on calibrating the flight-test instrumentation onboard the aircraft before moving it to Boeing Field in Seattle early next year for systems integration and additional testing.

"Program milestones, both big and small, are met daily thanks to our outstanding Poseidon team," said Bob Feldmann, vice president and P-8 program manager. "Since the start of final assembly in late March, the team has met all assembly milestones, including wing-to-body-join and start of the moving line in May, completion of full-power testing and engine installation in June and, most recently, engine run."

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013.

FMI: www.boeing.com/ids, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC