Manufacturing Underway Soon On Piperjet Altaire | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 27, 2011

Manufacturing Underway Soon On Piperjet Altaire

Mockup Back On The Summer Circuit

Piper Aircraft has started fabrication and assembly will begin in August of the first conforming flight test article of the company’s new single engine Altaire business jet. The inaugural flight of the conforming PiperJet Altaire is planned for 2012 with certification and deliveries in 2014.

“The Altaire is pioneering the single-engine business jet, just like the Piper Meridian and other single-engine turboprops have proven in rigorous worldwide use that the fundamental efficiencies and safety of centerline thrust aircraft deliver the greatest value to owners and operators,” said Piper President and CEO Geoffrey Berger.

“The advantage that Piper has over other manufacturers with an interest in a single-engine jet is a solid underlying commitment by Imprimis, the owner of the company, to appropriately fund the program and see it through to successful completion,” Berger says. Currently Piper has assigned nearly 200 engineers and production staff to deliver on the promise of an entry-level business jet with the economics of a turboprop and the cabin size and capabilities of a much larger business jet.

In addition to starting assembly of the first conforming flight test article, later this year Piper will begin fabrication and assembly of a structural test article, which will eventually be joined by three additional flying conforming test aircraft to become part of the certification program. Also part of the FAA certification program will be a bird strike canopy and a fuel cell/vibration test wing. Construction of all of these articles will be underway during 2012.

The company is in the midst of a $5.6 million program in building improvements to ready facilities at its Vero Beach, Fla. manufacturing and headquarters campus for necessary production, final assembly, completion and deliveries. Recently it named Altaire Chief of Production Michael Dow to oversee the manufacturing of the business jet.

A mockup of the PiperJet Altaire is on display at the Piper EAA AirVenture 2011 Exhibit. The Wisconsin stop is part of a continuing North American tour of the Altaire mockup at various aviation venues and presentations by Piper dealers so that customers and prospective customers can experience for themselves the spacious cabin and cockpit.

FMI: www.piper.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC