F-35A Deployed To Edwards Air Force Base For Expanded Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Oct 09, 2008

F-35A Deployed To Edwards Air Force Base For Expanded Testing

First JSF To Begin Some Serious Flight Testing

Lockheed Martin's F-35A successfully flew from Fort Worth, TX to California's Edwards Air Force Base on October 1, to begin expanded flight testing and initiate test activities at Edwards. Flying non-stop for more than 1,000 nautical miles, this was the aircraft's first long-range, cross-country flight.

"The ferry flight out was perfect," said F-35 Test Pilot Jeff Knowles. "The aircraft performed exactly as expected. Inflight refueling was flawless and we landed with no maintenance discrepancies. We couldn't have asked for a more successful first long-range flight."

During the F-35's deployment to Edwards, the flight test team will conduct ground and flight test activities for propulsion, aerial refueling and logistical support, and will hold training exercises for the test team.

"We expect to begin local Edwards flight operations next week after the test team has received the appropriate local-area orientation," said Doug Pearson, Lockheed Martin vice president of the F-35 Integrated Test Force. "Support from the Air Force Flight Test Center has been outstanding and I look forward to an efficient, innovative and very productive F-35 flight test program."

All 19 F-35 Developmental Test aircraft are currently in production and will be completed by the end of 2009. Additionally, production has begun on the first four Low Rate Initial Production (LRIP) aircraft.

FMI: www.teamjsf.mil, www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC