BA609 Tiltrotor Second Prototype Achieves First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Nov 10, 2006

BA609 Tiltrotor Second Prototype Achieves First Flight

The Bell/Agusta BA609 a/c 60002 performed its first flight on November 9th at AgustaWestland's facility located on the Italian Air Force airfield at Cameri, Italy. The first flight was completed successfully at 15.07 with Mr. Pietro Venanzi, Pilot and Mr. Herb Moran, Co-pilot onboard.

The rotorcraft performed left and right peddle turns, forward and aft flight maneuvers, several take-offs and landings, nacelle position changes and stability testing during the flight which lasted 52 minutes. Further flight test activities will take place during the next months in accordance with the test plan.

BA609 a/c 60003 is already at the AgustaWestland facility in Cameri and a/c 60004 is on the assembly line in Fort Worth, Texas. Bell/Agusta will produce a total of four prototype tiltrotor aircraft for flight-testing in the U.S. and Italy. BA609 a/c 60001 is continuing to undergo flight test activities at Bell's Flight Research Center in Arlington, Texas. To date it has accumulated over 100 hours of flight test time and has operated at 25,000 feet and speeds up to 304 knots.

Dual certification (European and FAA) is planned in 2010 with military qualification and deliveries following soon after. With customer requirements in mind, parts and components for both assembly lines in Italy and Texas will come from the same source. This key design concept greatly enhances the lifecycle supportability aspects of the BA609.

The current Purchase Agreement status remains strong with more than the first two years of production already allocated, for more than 60 civil aircraft and undisclosed government customers. The demand is expected to grow as flight tests continue and are completed through to certification. The BA609 continues to be one of the most highly anticipated aircraft ever, changing the possibilities of what an aircraft can do.

FMI: www.bellagustaaerospace.com

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC