NASA Issues RFP For Ares I Upper Stage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Feb 25, 2007

NASA Issues RFP For Ares I Upper Stage

Awards Turbine Pump Assembly To Hamilton Sundstrand

The plan for NASA's next generation space vehicle is starting to come together. On Friday, the space agency issued a request for proposal for the Ares I launch vehicle upper stage element. Ares I is the launch vehicle that will transport the Orion crew exploration vehicle and its crew and cargo to low Earth orbit.

The upper stage proposals are due to Marshall Space Flight Center no later than 1 p.m. CST April 13, 2007.

The request for proposal states the procurement approach for obtaining the upper stage element. The selected contractor will produce the required Ares I upper stage and provide support to a NASA-led design team during the design phase.

The contract will provide for the manufacture and assembly of test articles, flight test units, and the operational upper stage elements to support NASA's flight manifest through 2016. Final manufacturing and assembly will take place at NASA's Michoud Assembly Facility in Louisiana.

The Ares I upper stage, with a separately procured upper stage engine and a separately procured instrument ring, will provide the navigation, guidance, control and propulsion required for the second stage of the Ares I ascent.

The first stage will consist of a single reusable solid rocket booster and motor similar to those used on the space shuttle but with a fifth motor segment attached.

The contract to manufacture and assemble the Ares I upper stage element will be awarded through a full and open competition and managed by NASA's Marshall Space Flight Center in Huntsville, AL.

A selection will be made in August 2007.

NASA also announced Friday it selected Hamilton Sundstrand Space Systems International Inc. of Rockford, IL to design, develop, fabricate, test and deliver engineering models of a turbine pump assembly for the Ares I upper stage thrust vector control subsystem.

That two year, cost-plus-fixed-fee contract is worth approximately $5 million.

FMI: View The RFP, www.nasa.gov/ares

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC