Embraer Counts Down Days To First Flight Of Phenom 100 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 04, 2007

Embraer Counts Down Days To First Flight Of Phenom 100

Ground Tests Now Underway

Embraer tells ANN the Brazilian planemaker is currently performing the ground tests for the Phenom 100 very light jet, in preparation for its first flight. Engineers are making steady progress, according to representatives with the company, as they confirm the design quality of the aircraft and test the functionalities and integration of its systems.

"The Phenom 100 test campaign has begun and steadily advances," said Alexandre Figueiredo, Embraer Senior Manager, Phenom Programs. "The ground tests prepare the aircraft for its first flight and provide results for the certification process, which is scheduled to be completed in mid-2008."

These tests are an integral part of the development program, to make sure the aircraft meets its performance and availability goals. The first test conducted was the engine run, when the Phenom's engines were powered up after being mounted on the aircraft. They had already been thoroughly tested at Pratt & Whitney Canada’s facilities in Canada, and flown on its test-bed aircraft.

The Ground Vibration Test (GVT) is being conducted, with the objective of validating the aero-elastic model of the aircraft. During the test, the aircraft is suspended with elastic cables in order to float as if in flight.

Flight controls will be tested for flexibility, validating the primary control systems. The entire circuit of cables and brackets will be tested with a full surface load on the ailerons, rudder and elevator, confirming attrition and deflection conditions and no jamming.

Systems functionality and integration are the object of the main group of ground tests. All systems are evaluated both individually and jointly, confirming the aircraft’s operational capabilities, from taxiing through the first flight.

The engines are powered up, in order to generate and distribute electricity to all systems. The gyromagnetic compass, Global Positioning System (GPS) and the Attitude and Heading Reference Systems (AHRS) will be verified. System failure simulations will be performed to guarantee the safety of the aircraft during its first flight.

Electromagnetic interferences will be applied to the aircraft to ensure accurate systems operation. Finally, the test crew will perform low and high-speed taxi runs to confirm controllability of the steering, braking and emergency systems on the ground.

The first flight of the Phenom 100 will occur in the near future, upon completion of ground tests.

FMI: www.embraer.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC