Single European Sky Performance Scheme Targets Set To Disappoint Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Mar 13, 2013

Single European Sky Performance Scheme Targets Set To Disappoint Again

IATA: There Has Been A 'Progressive Weakening' Of EC Commission On SES

The International Air Transport Association (IATA) criticized the decision of the European Single Sky Committee to endorse weakened Performance and Charging Scheme regulations for air navigation services over the period 2015-2019. The decision was made on 8 March and impacts the calendar years 2015-2019 (known as Reference Period 2 or RP2).

If this decision is allowed to stand, regulators will have permitted a second period of weak regulation for the critical Single European Sky (SES) project. Diluted targets were previously set for RP1 covering 2012-2014, which air navigation service providers (ANSPs) could readily meet without the reforms needed to truly deliver the SES. “We should learn the lessons from the failure of RP1 to deliver the efficiency needed to put SES back on track. ANSPs and member states need the right incentives to drive the SES. The European Commission understands this. But we have seen a progressive weakening of their strong position under pressure from member states which continue to protect inefficient, state-owned ANSP monopolies over the needs of travelers and the environment for more efficient air traffic management,” said Tony Tyler, IATA’s Director General and CEO.
 
The critical deficiencies in the new regulations are:

  • A scheme which offers ANSPs the continuation of categories of costs termed "uncontrollable" which can simply be added after the fact to the agreed charges. Due to the weakening of the regulations, this concept is now even broader than its present application for RP1;
  • A facility to introduce congestion charging  without consideration of the cost burden to passengers or airlines or the likely distorting impact to the network;
  • Another deferral of terminal charge target setting. This will allow ANSPs to offset any reduction in charges which they may be required to make for en-route charges.

 

“Passengers, airlines and the wider European economy are losing EUR 5 billion every year from inefficient air traffic management. That’s the cost of the fragmentation of European airspace. But once again it looks like the cost-efficiency targets will be woefully short of what is required. The solution is a binding performance scheme, administered by a Europe-wide independent economic regulator. It’s the only way to motivate ANSPs to rationalize the duplication and waste of the current system. For example, Europe does not need the 63 air traffic control centers that it has today. We could have more efficient service with no more than 40,” said Tyler.
 
The actual targets for RP2 will be finalized in December. “Based on the evidence of the framework agreed last week, we are not optimistic that the numbers will be sufficiently ambitious. That will mean business as usual instead of the reform needed. The Single European Sky should by now have become a great and successful European project. But following this development, airspace users will be asking themselves why they should continue to support it financially or in any other way,” said Tyler.

FMI: http://europa.eu/index_en.htm

 


Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC