Boeing's Quick-Build 7E7 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jun 05, 2003

Boeing's Quick-Build 7E7

Three Days?

Chris Stetkiewicz, quite possibly the best heavy-aviation writer not writing for ANN, has latched onto what may be the key to Boeing's future success with its new 7E7 design: it's the ultimate "quick-build" kit.

Boeing isn't worried about meeting any "51% rule," so it has taken its subcontracting experience to the next level: outsourced components will be virtually "snap-together" on the new machine.

Just as Levittown homes popped up in hours sixty years ago, the prefabrication level in Boeing's new ordered assemblies will allow "plug and play" to cover even such things as cockpits, wings, and empennage.

Stetkiewicz noted, "Using a combination of new technology, materials and production processes and unprecedented amounts of sub-contracting, Boeing would slash final assembly times by between 75 percent and 90 percent, said Mike Bair, senior vice president on Boeing's 7E7 project. 'We're trying to get as much of the work down before final assembly so we bring the airplane together in relatively complete pieces and put it together in relatively short time,' Bair told a gathering of business executives in Everett, Washington..."

Mr. Bair went on to say that, while normal final-assembly times are typically over three weeks, three days is within reach, using new techniques and highly-qualified vendors. The new machine is also set to employ extensive composite structures, including the fuselage. That alone is supposed to make possible a cabin altitude of typically 6000 feet, as opposed to the industry-standard 8500, leading to greater passenger comfort. The new plane is full of such innovations, for safety, comfort, and efficiency.

Boeing VP Bair also said a 7E7 could probably be built by a workforce of about 1000 people, a fraction of today's labor requirement.

With labor costs' always rising, with increased governmental demands of employers, with the other advantages of foreign-sourced and machine-made assemblies, the reduction in final assembly time looks like the best option, for Boeing's future.

FMI: www.boeing.com

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC