Alaska TFR: TFN | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **
** Airborne 09.12.14 ** HD iPad-Friendly -- Airborne 09.12.14 **

Tue, Jul 13, 2004

Alaska TFR: TFN

NOTAM: 4/6708
Issued: 07/12/2004 00:33
Effective: Immediately - Until Further Notice
State: AK
Facility: ZAN - ANCHORAGE (ARTCC),AK.
Type: HAZARDS
Description: FAIRBANKS, ALASKA.
 
FDC 4/6708
ZAN FLIGHT RESTRICTION FAIRBANKS, ALASKA. EFFECTIVE IMMEDIATELY UNTIL FURTHER NOTICE, PURSUANT TO CFR 91.137A(2), FLIGHT RESTRICTIONS ARE IN EFFECT WITHIN THE BOUNDARY OF THE FOLLOWING LAT/LONG COORDINATES: 6508N/14729W 6510N/14658W 6505N/14628W 6503N/14707W 6503N/14731W 6506N/14732W AT AND BELOW 4000 FEET MSL TO PROVIDE A SAFE ENVIRONMENT FOR FIRE FIGHTING OPERATIONS. ALASKA DIVISION OF FORESTRY, (907)457-5944, OR (907)450- 8712 (VHF FREQ 122.225), IS IN CHARGE OF ON SCENE EMERGENCY RESPONSE ACTIVITIES. FAIRBANKS AFSS /FAI/ (907)474-0788 IS THE FAA COORDINATION FACILITY.

FMI: http://tfr.faa.gov/tfr/jsp/list.jsp

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

AD: Embraer S.A. Airplanes

AD NUMBER: 2014-19-01 PRODUCT: Embraer S.A. Model EMB-505 airplanes (Phenom 300)>[...]

ANN's Daily Aero-Linx (09.19.14)

Basejumper.com A site dedicated to the sport of BASE jumping. BASE is an acronym which stands for Building, Antenna, Span and Earth.>[...]

ANN's Daily Aero-Term (09.19.14): Breakout

A technique to direct aircraft out of the approach stream. In the context of simultaneous (independent) parallel operations, a breakout is used to direct threatened aircraft away f>[...]

Aero-News: Quote Of The Day (09.19.14)

"We're actually already in the process of putting some framework together, but we're going to hit the ground running when we get back in January." Source: U.S. Representative Sam G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC