G250 Integration Test Facility Marks 1,000 Hours Of Software Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Sep 06, 2010

G250 Integration Test Facility Marks 1,000 Hours Of Software Testing

Facility Allows For Avionics And Electronics Analysis

Gulfstream's G250 Integration Test Facility (ITF) has accumulated 1,000 hours of testing on the PlaneView250 software load that will be the basis for securing the aircraft's initial Type Certificate. Gulfstream reached the milestone just four months after evaluation of the Rockwell Collins-provided software began. Rockwell Collins is a strategic partner on the PlaneView250 flight deck, which features Pro Line Fusion avionics.


G250 ITF Cockpit

"The cockpit of the G250 is going to lead the industry," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "This test facility is a critical step in bringing this aircraft to market, because it allows us to integrate, test and make adjustments on the ground."

The G250 facility is the first mid-cabin ITF for Gulfstream. The company initiated the ITF concept with the large-cabin GV and developed similar facilities for the G450 and G550. Those facilities, located with the G250 ITF at the company's headquarters in Savannah, are still in use today.

"It's been a great tool," said Mark Kohler, G250 program director, Gulfstream. "It allows us to do the testing in a very safe environment and at a much quicker pace. That's the significance, to be able to accelerate the development effort and ensure the end product exceeds customers' expectations."


G250 First Flight

The G250 ITF was initially powered on November 20th, 2007, and had its first simulated flight on July 7th, 2008. The facility allows engineers to perform a thorough analysis of the aircraft's avionics and electronics to ensure they meet the certification requirements. The facility is also ideal for human-factors analysis, allowing certification authorities to make and test changes on the ground before applying them to the actual aircraft.

In addition to testing, Gulfstream utilizes the ITF to demonstrate the aircraft's capabilities to the Gulfstream Customer Advisory Board (CAB) and potential customers. CAB participants are Gulfstream operators who provide input on aircraft in development and feedback on services the company offers.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC