Playing Catch-Up: NASA Plans Six Shuttle Flights In 2008 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jan 07, 2008

Playing Catch-Up: NASA Plans Six Shuttle Flights In 2008

Accelerated Schedule Causes Safety Concerns

Faced with continued launch delays, and a hard September 2010 deadline for retirement of the shuttle fleet, NASA is scrambling to play "catch-up" on its obligation to wrap up construction of the International Space Station -- and has scheduled six shuttle missions this year to do it.

That would be twice the number of missions completed last year... and the agency is already handicapped by a one-month-plus delay in launching Atlantis due to problematic fuel level sensors in the external fuel tank. As ANN reported, NASA now aims for a January 24 launch for that orbiter... though it appears more likely it will be February before Atlantis takes flight.

The mounting schedule pressure is raising concerns that NASA may have to cut corners in its rush to get all those missions in, reports The Washington Post.

"This pressure feels so familiar. It was the same before the Challenger and Columbia disasters... this push to do more with a spaceship that is inherently unpredictable because it is so complex," says Duke University professor and former NASA historian Alex Roland.

William H. Gerstenmaier has been with the shuttle program since the beginning, and now serves as NASA's chief of space operations. He says while the shuttles are now 27 years old, they're actually safer than ever due to all the accumulated knowledge about how to fly them.

So... why the hard deadline? You may thank the White House for that. In 2004, President Bush called for the retirement of the shuttle fleet on September 30, 2010 -- so the agency could divert its efforts to further-flying (and higher-profile) missions to the moon, and beyond.

Gerstenmaier remains optimistic NASA will be able to do the job, on-time. "The schedule we've made is very achievable in the big scheme of things," he said, before adding a disclaimer. "That is, unless we get some unforeseen problems."

Alas, unforeseen problems have defined the shuttle program since its inception.

John Logsdon, a former member of the panel which investigated the 2003 Columbia disaster is now a space policy analyst at George Washington University. He tells the Post another shuttle failure would likely suspend the manned space program for years, and must therefore be avoided at all costs. Somewhat contradictory, however, Logsdon wants NASA to wrap up the shuttle program, post haste.

"Every time we launch a shuttle, we risk the future of the human space flight program," he said. "The sooner we stop flying this risky vehicle, the better it is for the program."

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC