Lockheed Martin Orion Team Fabricates World's Largest Heat Shield Structure | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Mar 07, 2010

Lockheed Martin Orion Team Fabricates World's Largest Heat Shield Structure

Innovative High-Temperature Material System To Provide Better Crew Protection

The Lockheed Martin-led team developing the Orion crew exploration vehicle achieved a major technology milestone by completing fabrication of the world's largest heat shield structure. The shield is five meters (16.4 feet) in diameter and is critical to the protection of the spacecraft and its crew from the extreme temperatures experienced during re-entry. The work was completed at Lockheed Martin's composite development facility in Denver, CO.

The crew exploration vehicle is at the height of its development phase, which has spurred several new technologies and innovations such as a cutting edge high-temperature composite material system. The new system was developed by the Lockheed Martin Orion thermal protection system team in partnership with TenCate Advanced Composites, a leading supplier of aerospace thermoset and thermoplastic prepregs. TenCate's composite materials are used in commercial aircraft, radomes, satellites, general aviation, oil and gas, medical and high-end industrial applications.

"In addition to the technology advancement, we achieved a $10 million cost savings and improved the project schedule by 12 months through the innovative tooling, materials and fabrication processes the team put into action," explained Cleon Lacefield, Lockheed Martin vice president and Orion program manager.

The new resin system was developed over an 18-month period during which thousands of coupons were tested in extreme environments that simulated a ballistic re-entry from a lunar mission. The team verified that the thermal insulator on the outside of the composite material can be thinner due to the higher temperature capability, resulting in improved mass optimization of the Orion spacecraft.

Orion Crew Module Artist's Concept

The new resin system enables much simpler and more efficient manufacturing techniques compared to other high temperature resin systems. This resin system has the potential to be used in a wide range of commercial applications including aircraft, automobiles, launch vehicles, payload fairings, and re-entry vehicles.

The expansive heat shield will be applied to the Orion ground test article, which is the first full-sized, flight-like test article for Orion being built at the Michoud Assembly Facility in New Orleans, LA. The ground test article is designed to serve as a production pathfinder to validate the flight vehicle production processes and tools. When completed, the crew module will be tested on the ground in equivalent flight-like environments, including static vibration, acoustics and water landing loads. This early high fidelity testing is necessary to correlate sizing models for all subsystems on the vehicle.

FMI: www.lockheedmartin.com/orion

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC