AD Requires Cycling Of Power On Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 03, 2016

AD Requires Cycling Of Power On Dreamliners

FCMs Could Reset During Flight If Left On More Than 22 Consecutive Days

An Airworthiness Directive published in the Federal Register Friday requires repetitive cycling of either the airplane electrical power or the power to the three flight control modules (FCMs). This AD was prompted by a report indicating that all three FCMs might simultaneously reset if continuously powered on for 22 days on all Boeing 787-8 and 787-9 airplanes.

According to the FAA, reports have been received indicating that an FCM will reset if continuously powered on for 22 days. This condition, if not corrected, could result in simultaneous resets of all three FCMs, which could result in flight control surfaces not moving in response to flight crew inputs for a short time and consequent temporary loss of controllability.

The FAA is requiring compliance with the AD by all 99 Dreamliners registered to U.S. operators within a week.

The FAA considers this AD interim action. Boeing and its suppliers are developing a terminating solution to address the identified unsafe condition. Once this terminating solution is developed, approved, and available, the agency might consider additional rulemaking, according to the published AD.

The Seattle Times reports that in a statement, Boeing said that the AD addresses an issue that it has already been brought to the attention of Dreamliner operators. The company says a permanent software fix "is anticipated in the second quarter of 2017."

An aviation analyst who requested anonymity told the paper that airlines almost never leave a jet powered on for longer than a week.

The FAA estimates that the cost of cycling the power on the airplanes will cost about $85 per airplane per cycle.

(Image from file)

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC